The forms for concrete are down and the concrete in.

Cannery Bay now has concrete roadbeds and
plants. The water area (the bay), which will consist of the log dump and
car ferry on the other side of the bay, are still under construction until we
figure out how to best do it. The design engineer is still working on it.



